Float Dashboard
Know which items are at risk before it is too late
Real-time delivery and fabrication float across every long lead item. Float is always computed live from source dates — never stale, never stored. See which items are healthy, at risk, or overdue at a glance.
LLI Lifecycle Tracking
11 stages from PO to handover
Track every long lead item through its complete lifecycle: PO issued, engineering, fabrication, inspection, ready to ship, in transit, at port, delivered, installed, commissioned, handed over. Every milestone is recorded with a full audit trail.
FAT/SAT Inspection Gates
Quality gates that control the workflow
Factory acceptance testing at the vendor facility and site acceptance testing at the construction site as configurable gates. Punch list tracking, photo evidence, and pass/fail decisions that determine whether an item can proceed.
Delay Exposure Engine
Know the cost of delays before they happen
When float goes negative, the financial exposure is calculated automatically: days late multiplied by daily contractor overhead rate. This gives project managers and commercial teams the data they need to make escalation decisions.
Multi-Lot Shipping
Large items ship in pieces — track every piece
When a single LLI ships in multiple lots, each lot is tracked independently with its own shipment record. Assembly window alerts notify you when all pieces for a single installation must arrive within a given timeframe.
Cost Tracking per LLI
Estimated versus actual, at the item level
Track estimated versus actual costs at the individual long lead item level. See budget variance, cost overruns, and multi-currency totals across project currencies. Every financial event is recorded as an immutable cost ledger entry.